Quick Closure

The Quick Opening Closure Lock Ring is an important component of the pressure vessel. It has many advantages. For example, the opening and closing speeds are fast, the operation is smart, simple, safe, and reliable.

Articulated type QOC (horizontal type) installation, use, maintenance manual

Description

Operating Instructions for a Quick Closure

Quick Closure

1. Structure

Quick Closure, the pressure vessel’s ring is a crucial part. There are a lot of benefits. For instance, the operation is smart, simple, safe, and dependable. The opening and closing rates are very quick. The high neck, door cover, ring lock, and locking mechanism make up the Quick Closure. Safety interlocks and sealing rings are further options. Ring grooves may be found on the door cover’s outer circle and the high neck’s inner circle. When operating, the high neck groove receives a portion of the ring lock.

The door cover groove holds the other part, which is also embedded, which locks the door cover and the high neck as a result. Tighten the ring lock with a booster rod via the locking mechanism before opening the door. due to the fact that as a result, its outer ring is smaller than the door cover’s outer diameter, enabling the opening of the door cover. So, it operates in a really convenient manner. The seal ring is made using top-notch materials and a logical structure. The performance of the product seal is ensured. There is also a safety interlock device with an alert feature included in the equipment. It can provide adequate security and dependability.

2. Overview

Every day, cleaning, unblocking, checking, and cleaning is required for pressure vessels. At the nozzle, there is a fixed quick-opening device called the quick-opening blind plate. Many machines have quick-opening blind plates on the filter separator and launcher. In conclusion, please get in touch with our experts if you have any additional queries so they can assist you.

3. Workflow processes

1. Inspection and preparation

(1) Inspect the Quick Opening Closure and associated components for damage.
(2) Check that each valve is in the open or closed position before removing the blind plate.
(3) The operator must first exhaust the natural gas in the launcher and receiver. Check to make sure the ball cylinder is not under pressure. In other words, the pressure-indicating device on the apparatus is showing zero. (4) Get the required tools ready. And keep the vent valve fully open.

2. Opening of lock ring Quick Closure

(1) Open the pressure vessel’s blowdown and vent valves. (2) Remove the bleeder valve after reducing the pressure in the cylinder to zero. (3) Rotate the screw rod in a clockwise direction. Remove the safety card. In a certain location, this splits the pressure ring. (4) Gently lift the handle of the blind plate cover so that the teeth of the left and right pressure rings are entirely separated. The blind plate is accessible.

3. Closing of Quick Opening Closure

(1) The sealing groove and upper and lower pressure ring handles are entirely removed after the debris on the sealing surface. Apply antirust grease; push the blind plate cover all the way into the press ring; and then (3) turn the screw rod in the other direction. (4) Install the safety card; lock the cover. (5) Close the pressure vessel’s vent valve and blowdown valve after tightening the vent valve.

4. Precautions for operation and maintenance of Quick Closure

No one is permitted to stand inside or in front of a quick-opening blind plate, and users are required to be familiar with its design and usage guidelines.
Before removing the cover, the air valve needs to be opened. When the container’s pressure is at its lowest. Prior to pressurizing the pressure vessel with the blind plate, we can only then open the blind plate. And install the quick closure first.
It is not permitted to hit against or clash with any major pressure-bearing components after use;

(1) The surface of the blind plate must always be kept undamaged and clean; (2) The primary pressure-bearing components of the blind plate (such as the cylinder surface and blind plate cover) should be inspected frequently. If we notice significant corrosion or fissures. Timely discovery of the cause. And handle it appropriately. (3) The sealing rubber ring and sealing groove must be cleaned, checked, and oiled after each usage.

5. Risk analysis and reduction measures

Quick Opening Closure risk analysis and reduction measures

Fault

Reason

Method

Leakage at the blind plate seal

①There is dirt on the sealing groove, sealing surface, and O-ring surface;

②Aging of the sealing ring

Clean it up and install the seal

Leak at safety interlock

①There is dirt on the sealing groove, sealing surface, and O-ring surface;

②The sealing ring is aging.

Clean it up and install the seal

The blind cover and the blind seat are dislocated

Slewing mechanism parts loose or displaced

①Up and down dislocation: adjust the adjusting nut on the rotary hinge shaft;

②Dislocation from left to right: Adjust the positioning screw on the shaft sleeve

Other faults

Contact the manufacturer

Common faults and treatment of quick-opening closure

Operational work activities

Hazardous factors

Harmful consequences

Risk Control Measures

Quick opening closure operation

Ferrous sulfide powder spontaneous combustion

Fire explosion

The staff strictly follows the operating procedures. To take wet work. Periodically clean the container of dust and condensation. Strictly control all fire sources. Prevent air from entering the sewage system. Monitoring natural gas concentration

Fire, explosion

Personal injury, equipment damage

Wet ball collection. Strictly follow the operating procedures. Strengthen work supervision. Monitor natural gas concentrations. Operators wear protective clothing. Use explosion-proof tools. Control all fire sources

Natural gas leak

Fire, explosion

Strengthen inspection and operation supervision. Strictly follow the operating procedures

Mechanical damage

Casualties

Strengthen inspection and operation supervision. Strictly follow the operating procedures. Wear labor protection equipment. Do not face the device directly during operation. The operator should stand on the side.

Poisoning, suffocation

Casualties

Strengthen inspection and operation supervision. Monitor harmful gas concentrations. Strictly follow the operating procedures. Wear gas mask, air respirator

6. Quick Closure storage precautions

if the infant needs temporary storage for the quick-opening blind plate (or the container it is contained in). We have to be blind.

A thin layer of anti-rust protective wax or any type of alternative protective material shall be applied to the inner surface of the board’s high neck. All machining and sealing surfaces fall within this category.
On the head cover, remove the sealing ring. The surface of the organically processed object is next delicately coated with a protective substance once more. Finally, to stop moisture, we reinstall it into the head cover seal ring.
Remove any protective items from the groove and sealing surface before fitting the sealing ring, and then evenly spread the antirust lubricant over the area.

(1) Measures to reduce stress and deformation

to make sure the sealing is effective. Keep the amount of deformation from welding, assembly, and post-weld heat treatment to a minimum. The following recommendations can help to lower this type of risk:

  1. On a simple body, the branch pipe connection cannot be placed close to the high-neck welding’s circumferential weld. The branch pipe’s nominal diameter must be smaller than the distance between welding edges.
  2. After connecting the vessel branch pipe. Weld the seam that runs from the simple body to the high neck of the Quick Opening Closure. The door cover for the blind plate should also be taken off before welding.
  3. Maintain the preheating temperature at at least 209 c. However, the employed welding process judgment record’s technical welding parameters must be considered.
  4. To continue providing heat continuously. Use a completely or somewhat automated method, please.
  5. If a manually operated metal arc procedure is used. It is required to use a staggered welding sequence.
  6. A large blind plate with a fixed lifting lug separate from it. With temporary lifting lugs, it can be mounted. It might help to support the welding position.

(2) Maintain

Ring lock adjustment

We should adjust the ring lock if the alarm screw and ring lock are difficult to use.
Install the alarm screw and insert after expanding the ring lock to its locked (closed) position in step 1. The alarm screw must be simple to set up and tighten.
2. Rotate the locking pull plate by adjusting the eccentric sleeve, which is located between the eccentric and shaft sleeves.
3. After finding the ideal position, tighten the Allen screw to secure the eccentric sleeve.
4. Verify once more by stretching and contracting the ring lock. Follow the instructions above if the adjustment is necessary.

Replace the sealing ring

The seal ring of the blind plate may need to be taken off if necessary. After that, we merely remove the sealing ring from the sealing groove. However, we must be careful that hard and sharp items do not harm the sealing surface.

  1. Before opening the sealing ring’s package. The sealing groove requires cleaning. Then spread a light coating of silicone grease uniformly.
  2. Reposition the sealing ring into the sealing groove, ensuring that it has two radial corners. The sealing ring should be inserted into the sealing groove at the top (12 o’clock). Then, install each one separately (at 6, 3, and 9 o’clock). Next, we install the remaining components uniformly. The sealing ring should be smoothly inserted into the sealing groove’s center, and that’s the last thing to check.
  3. Next, conduct the hydraulic test. It is advised to perform fault detection on the seal ring after the test when the design pressure is greater than or equal to 11mpa. The sealing ring must be replaced if damaged.

Our Service

  1. There are numerous varieties of quick-closing closures, each with a different type to suit a different need.
  2. To vouch for the excellence of our services, samples will be made available.
  3. Quickest feedback!
  4. The quickest delivery period. Online for 5.24 hours/7 days.

Packing & Delivery

Packing & Delivery
We use PLYWOOD CASE as packaging, it has the following advantages:
1. Lightweight, clear lines, insulation, high strength, not easy to deform;
2. Requiring no fumigation.
Transport
By Air

We cooperate with many express companies. That could help you choose a courier company with cheaper freight.

 
By Sea
Shenyang is close to Dalian Port, inland transportation costs almost nothing and takes short time.